words that say Thurston County

Thurston County Basin Plans

Salmon Creek Comprehensive Drainage Basin Plan, Phase 1

salmon creek plan phase 1 coverNote: The report on this Web page has been divided into several PDFs to make it easier and faster for viewers to find information; however, the PDFs still take time to load because they  were scanned from a paper-version of the document (as opposed to simply converting a Word document to a PDF).

Instead of waiting to view the files through this web site, a better choice is to right-click the underlined hyperlink and then "save target" (ie., save the file) to your own computer and open it from there. Use the magnifying glass in Adobe to zoom in.

This Phase I document embodies information and modeling results from the URS Corporation and Pacific Groundwater Group. This report formed the basis of Phase 2 -- the actual basin plan.)

red arrowAlso see monitoring data

Salmon Creek Conceptual Hydrological Model, December 2000

Full report (474 MB -- huge file): Click the link to the left to see the full Phase I report, minus the tables, figures and appendices below.

Tables referenced in the Phase I report:

Figures referenced in the Phase II report:

Appendices referenced in the Phase II report:

Contact Us

 Staff contact: Larry Schaffner (360) 754-4106 E-mail: schaffl@co.thurston.wa.us

 

 

This page last updated: