Water and Sewer
Program Links

 

Program Home

Boston Harbor

Tamoshan

Grand Mound

Olympic View

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

Water and Sewer Services

 

Boston Harbor Water and Sewer Services

The Boston Harbor Treatment Plant provides water and sewer service to the Boston Harbor Community.

The water source consists of two wells, each drilled in the TQU Aquifer approximately 150 feet apart adjacent to the water reservoir site.

The sewer system is a STEP tank system, with wastewater pumped to the Boston Harbor Wastewater Treatment Plant. The Boston Harbor reservoir was replaced in 2004 due to damage received in the 2001 Nisqually Earthquake.

Billing Information

Thurston County bills water and sewer customers at the end of each month, after meters are read. 

  • For water service: Customers pay a "base" rate, plus a "usage" rate that reflects how much water they use.
  • For sewer service: Customers pay a fixed rate each month.

Thurston County also charges a $55 fee for reconnecting a property from water and/or sewer service.

Note: One cubic foot of water is roughly 7.5 gallons. Likewise, 100 cubic feet of water is roughly 750 gallons.

Boston Harbor Utility Rates for 2010 (per month)

   

Water Rates

$20.90 base rate plus water usage rate of $1.57 per 100 cubic feet of water used (roughly 750 gallons)
   

Sewer Rate

$73.03 fixed rate 
 Taxes   Washington State taxes are added to each bill
   

 

Information and Resources

2009 Consumer Confidence Report   Making the Best Use of Your STEP System
     
Service Boundary (7.4 MB PDF)   Ordinance 14318 - 2010 rates
     
     

Questions? Call Denise Velthuysen at 709-3077 or route an e-mail message through wwm-webmaster@co.thurston.wa.us

Last updated: 01/28/10 04:13 PM